THE PROCESS
Step One: Consultation
Step one consultation includes:
- Free Estimate
- Color and design options customized to fit the space
- Project timeframes are 3-5 days
- 50% down payment to book
Step Two: Preparation
Step two surface preparation includes:
- Epoxy can go over both tile and laminate counters
- Tape and plastic to protect areas from epoxy
- Sanding
- Bonding Primer
- Undercoat
Step Three: Epoxy
Step three epoxy includes:
- Pouring food grade, UV resistant epoxy
- Clear Coat
Step four: clean up
Step four epoxy pour includes:
- Top Coat Optional-top coat is heat, impact, and scratch resistant
- 24 hours for light use, 30 days until full hardness/durability is achieved
- Clean Up
- Care is similar to quartz: use non-abrasive cleanersÂ